Removal of Pump
2/2/24
Mid-morning on Monday 2/5 Ramey Environmental will be removing the dewatering pump from the corner of Twin Bridge Drive and Long Drive using a crane and loading it onto a flatbed truck. It is not expected to block any roads.
The dewatering pump is being removed for repair.